Catawba Workday 9/11/04
Saturday, Sept. 11th at 9:00 am is the date, and we plan to do a few things to get the race ready for the Oct 2-3 Cane Creek Cup Races. This will also be an opportunity for those participating in that regional series to log some "Pay Dirt" hours for points credit.

Some of our goals for that day are:

-Work on the new entrance trail to correct any issues that have popped up
-Fix the berm that launches you into the last wooded section to the right of the power line (it was affected by the bulldozers recently)
-Build a short connector on the Trutzschler trail to by-pass the fall-line plunge and ensuing climb that are currently deteriorating
-Clear a short temporary connector from near the bottom of practice (toilet bowl) loop to the big red road for use during the short track race on Sat., Oct. 2nd.

We'll send a reminder e-mail to the Topica list the week of the workday.

Pack a lunch, we ride after we work!
Thanks, Frank and Doug