Page Index Toggle Pages: 1 Print
Normal Topic Kudos for the work at Sherman (Read 323 times)
DK
Small Cog
***
Offline


Work Ride Tarheel Trailblazers

Posts: 348
Joined: 11/21/14
Kudos for the work at Sherman
04/20/16 at 12:57am
Print Post  
I've been off the bike for the past 9 weeks after foot surgery and have just been able to take my first rides this week.  I just wanted to say thanks to those that have put in time over the last 9 weeks to do some of the work out there.  The new bridge crossings at the main/lake intersection will go a long way to helping those areas not degrade like they had.  It's apparent some drainage areas have been improved and the tree obstacle on the main loop is nice.  I'm sure it's all been done over a few weeks but when you haven't been able to ride in as long as I have all the changes are readily apparent.  Hopefully in another 2 or 3 weeks I can lend a hand with all the great work being done to the area trails.

  
(You need to Login or Register to view media files and links) (Attachment deleted)

David

2016 Santa Cruz Tallboy C
Back to top
 
IP Logged
 
Page Index Toggle Pages: 1
Print