Page Index Toggle Pages: 1 Print
Normal Topic BYT back 1/3 closed. (Read 296 times)
worker-rider
In The Loop
*****
Offline



Posts: 962
Location: concord nc
Joined: 12/18/04
BYT back 1/3 closed.
08/17/16 at 4:26pm
Print Post  
We closed the back 1/3 of the trail across the service road. The powers that be asked us to close it until the greenway is done. So if you would please stay out of the work area while construction is going on. We were also asked to move all entry and exit points. That will take place after greenway is done. The pipe dream will also close until we move that trail to add more jumps and a creek gap. Thanks for your patience while this is going on. If you have any questions please post up and I will answer them with what I know. I have been out blowing the sticks and crap off the trail over the last few days and if you are out please pick up trash, bottles all over the place. I also would like to ask those of you who I see ride BYT all the time to please stop and pick up sticks. That small gesture would same me a hell of a lot of time.  Thanks Josh for your help!!!!!!
« Last Edit: 08/17/16 at 4:30pm by worker-rider »  
(You need to Login or Register to view media files and links) (Attachment deleted)
Back to top
 
IP Logged
 
Page Index Toggle Pages: 1
Print