Page Index Toggle Pages: 1 Print
Normal Topic Trail work at Fisher Farm this Sunday, Nov 6 (Read 604 times)
The Cycle Path
IB Room
In The Loop
Project Board
Offline


Treasurer '11 to '18.
Trail Chair '12-'18,
'20-'21

Posts: 11858
Location: Lake Norman
Joined: 08/04/03
Trail work at Fisher Farm this Sunday, Nov 6
11/02/16 at 12:02pm
Print Post  
We'll be back at it again at Fisher this weekend on our Rootapalooza on the green loop.  Made some good progress last weekend and hoping to finish up this Sunday.  We will also have a couple special armoring projects going on as well if we have a good turn out!  So come on out! Smiley

What to bring:  Yourself, water and possibly a snack.

What to wear:  Long pants, boots and gloves are recommended.

We will provide all the tools and instruction you will need.

It's a great way to burn off all those End of Year Party calories off!

Meet in the small parking lot by the barns.  Will start at 8:30am.
  
(You need to Login or Register to view media files and links) (Attachment deleted)

We carry the finest from Specialized, Yeti, Transition, and Kona.
Back to top
IP Logged
 
The Cycle Path
IB Room
In The Loop
Project Board
Offline


Treasurer '11 to '18.
Trail Chair '12-'18,
'20-'21

Posts: 11858
Location: Lake Norman
Joined: 08/04/03
Re: Trail work at Fisher Farm this Sunday, Nov 6
Reply #1 - 11/08/16 at 8:10pm
Print Post  
Great turn out this past Sunday!  Had 7 volunteers show up and help finish up our winter maintenance of Fisher!  We have a couple of special projects that Tom F will be leading so stay tuned!
  
(You need to Login or Register to view media files and links) (Attachment deleted)

We carry the finest from Specialized, Yeti, Transition, and Kona.
Back to top
IP Logged
 
Tom F
In The Loop
*****
Offline


I'm ready. Get the bike.

Posts: 2028
Location: Can-of-pooless, NC
Joined: 08/06/10
Re: Trail work at Fisher Farm this Sunday, Nov 6
Reply #2 - 11/09/16 at 12:53am
Print Post  
There are a couple spots on the lower green that need armoring to protect the roots and narrow the trail. Also  the drop off before the table top need a little touch up to the lip and the table top is wearing down. The go around needs some hardening up also. If there is time would like to armor the roots on thunder road where the climbing turn goes over the roots and the large cedar logs are on the inside. I'll try  get out there Saturday and stage some more material. There is a lot of rip rap ready to go on the lower end for armoring.
Remember bring gloves, hydration, sturdy shoes. We have the tools.
I rode what MArk and the crew did on Sunday. Nice work!
  
(You need to Login or Register to view media files and links) (Attachment deleted)

2011 (frame) Santa Cruz Superlight & Stumpy Comp (1999), 2017 Tallboy C RX2
22Levo
Back to top
 
IP Logged
 
Page Index Toggle Pages: 1
Print