Page Index Toggle Pages: 1 Print
Normal Topic Trail work at Rocky Branch 3/18 and 3/19 (Read 1044 times)
The Cycle Path
IB Room
In The Loop
Project Board
Offline


Treasurer '11 to '18.
Trail Chair '12-'18,
'20-'21

Posts: 11858
Location: Lake Norman
Joined: 08/04/03
Trail work at Rocky Branch 3/18 and 3/19
03/14/17 at 12:23pm
Print Post  
We are building a new pump track at Rocky Branch Park and could use your help. The city is providing the dirt; the THTBs are providing the equipment, operators and expertise; the only thing we are missing is you the volunteers to assist us make it happen. Where:      The main entrance of Rocky Branch Park, Belmont When: March 18 and March 19 Time: 8:00 am to 4:00 What to bring: Gloves and water is all you really need, but if you have your favorite wheelbarrow, shovel or rake, feel free to bring it. Whether you can help the whole time or just for an hour or so please stop by. Check the Down and Dirty (trail Work) forum under Rocky Bunch Pump Track for updates or PM me with questions. The kids (in all of us) have been asking for it and we are getting ready to give it to them, but not without the help of the volunteers that make our trail systems great.
  
(You need to Login or Register to view media files and links) (Attachment deleted)

We carry the finest from Specialized, Yeti, Transition, and Kona.
Back to top
IP Logged
 
BJE
Coaster Bike
**
Offline


Work Ride Tarheel Trailblazers

Posts: 222
Location: Belmont
Joined: 01/27/15
Re: Trail work at Rocky Branch 3/18 and 3/19
Reply #1 - 03/14/17 at 7:55pm
Print Post  
The dirt has started to arrive, the equipment is being readied, all we need is volunteers.

Revised time
Saturday 3/18:
Equipment set-up and prep work 8:00 to 11:00.
Volunteer Work Hours: 10:00 to 5:00
Sunday 3/19:
Equipment Set-up 9:00 to 10:00
Volunteer Work 10:00 to 5:00

THANK YOU IN ADVANCE FOR EVERYONE'S HELP.
  
(You need to Login or Register to view media files and links) (Attachment deleted)
Back to top
 
IP Logged
 
BJE
Coaster Bike
**
Offline


Work Ride Tarheel Trailblazers

Posts: 222
Location: Belmont
Joined: 01/27/15
Re: Trail work at Rocky Branch 3/18 and 3/19
Reply #2 - 03/16/17 at 4:55pm
Print Post  
The dirt is piling up and waiting to be placed. Now all we need to do is move it, pack it, wet it, shape it, then ride it. 

I have attached a waiver that will need to be signed so you can either bring with you or I will have them at the park. (If under 18 a parent or guardian must also sign).   

Hope to see you out there.
  
(You need to Login or Register to view media files and links) Accident_Waiver_and_Release_of_Liability_Form.pdf (Attachment deleted)
Back to top
 
IP Logged
 
Bikin Dad
Coaster Bike
**
Offline


A Dad, A Dreamer & Rider
of 2 wheelin' fun!

Posts: 168
Location: Concord
Joined: 04/07/14
Re: Trail work at Rocky Branch 3/18 and 3/19
Reply #3 - 03/17/17 at 7:19pm
Print Post  
Just dropping this little gem from a race there last Spring at Rocky Branch! Props to the Trailblazers involvement & now of what's to come.... (You need to Login or Register to view media files and links)
  
(You need to Login or Register to view media files and links) (Attachment deleted)

A working Dad for 3, plus new bike stuff, founder of Bikin' Dads Adventures & ready to ride!
Back to top
IP Logged
 
BJE
Coaster Bike
**
Offline


Work Ride Tarheel Trailblazers

Posts: 222
Location: Belmont
Joined: 01/27/15
Re: Trail work at Rocky Branch 3/18 and 3/19
Reply #4 - 03/18/17 at 11:45am
Print Post  
Pump track update.
Rain delay.  Equipment starting at 10:00. Volunteers Plan on starting at 12:00 pm. Check back for updates if still raining.
  
(You need to Login or Register to view media files and links) (Attachment deleted)
Back to top
 
IP Logged
 
BJE
Coaster Bike
**
Offline


Work Ride Tarheel Trailblazers

Posts: 222
Location: Belmont
Joined: 01/27/15
Re: Trail work at Rocky Branch 3/18 and 3/19
Reply #5 - 03/20/17 at 1:27am
Print Post  
GREAT JOB EVERYONE that worked and helped put this project together and complete it in only two (long) days.

With the expertise involved (not mine but others) in the planning and construction of the pump track i knew that it would come out great, and it did.

Come out and check out and ride the new Belmont Rocky Branch Pump Track (but please only when it is dry). Enjoy.
  
(You need to Login or Register to view media files and links) (Attachment deleted)
Back to top
 
IP Logged
 
TrillWill
IB Room
In The Loop
Project Board
Offline


THTB Board member 16'-23'
LKN TC

Posts: 1027
Location: Cornelius
Joined: 06/14/11
Re: Trail work at Rocky Branch 3/18 and 3/19
Reply #6 - 03/20/17 at 4:29pm
Print Post  
This track turned out great!  check out some pics here on our facebook page (You need to Login or Register to view media files and links)
  
(You need to Login or Register to view media files and links) (Attachment deleted)

Ride boards, ride bikes, ride life #shredeverything
Back to top
 
IP Logged
 
catsruletn
IB Room
In The Loop
Project Board
Offline


My bike demands rights!!

Posts: 2262
Location: Charlotte NC
Joined: 07/20/06
Re: Trail work at Rocky Branch 3/18 and 3/19
Reply #7 - 03/20/17 at 10:15pm
Print Post  
Very nice job everyone! I am very impressed.
  
(You need to Login or Register to view media files and links) (Attachment deleted)

Our doubts are traitors and make us lose the good we oft might win by fearing to attempt.
Back to top
 
IP Logged
 
Page Index Toggle Pages: 1
Print