Re: Trail Work at Rocky Branch Park
Reply #20 - 11/01/17 at 6:38pm
Print Post  
Glad you enjoyed riding it.  Let me know next time your out this way and I will be glad to ride with you.  Since you are still riding I guess your wife is still keeping the baby to herself.   Cheesy
  
(You need to Login or Register to view media files and links) (Attachment deleted)
Back to top
 
IP Logged
 
BJE
Coaster Bike
**
Offline


Work Ride Tarheel Trailblazers

Posts: 222
Location: Belmont
Joined: 01/27/15
Re: Trail Work at Rocky Branch Park
Reply #21 - 11/08/17 at 5:16pm
Print Post  
Heading out on Saturday morning (11/11 between 9-1) to work on two new re-routes and a new section of trail.  Both of these are at or near the entrance of the trail. I have flagged and done some preliminary clearing, now need to finish clearing and start doing the finishing cut. If you want to help or provide some input in the trail before it is finalized come on by.  I will have tools (unless you like using your own), so you just need gloves and water.  Long pants and shirts also recommended since the trails are still in their beginning stages.

THANK YOU IN ADVANCE FOR YOUR HELP.   Smiley

« Last Edit: 11/09/17 at 5:16pm by BJE »  
(You need to Login or Register to view media files and links) (Attachment deleted)
Back to top
 
IP Logged
 
BJE
Coaster Bike
**
Offline


Work Ride Tarheel Trailblazers

Posts: 222
Location: Belmont
Joined: 01/27/15
Re: Trail Work at Rocky Branch Park
Reply #22 - 11/13/17 at 4:09pm
Print Post  
Thanks Dave and Jay for helping me get a lot done this weekend.  Everybody I ran into liked the new reroute on Scott's Loop and the new entrance trail is looking good and is almost ride-able.   

Thanks again.
  
(You need to Login or Register to view media files and links) (Attachment deleted)
Back to top
 
IP Logged
 
BJE
Coaster Bike
**
Offline


Work Ride Tarheel Trailblazers

Posts: 222
Location: Belmont
Joined: 01/27/15
Re: Trail Work at Rocky Branch Park
Reply #23 - 12/05/17 at 5:31pm
Print Post  
One of the local Belmont boy scout troops (Troop 56)  Cheesy will be getting some service hours by lending a hand with some trail upkeep this Saturday (12/7) from 11:30 to 2:00.  Grin  We are always open to more help.  If you would like to come out and help too and help show the scouts how great trail is maintained, come on out. I will be out there earlier (9:00 ish) working on a new beginning section.

THANK YOU IN ADVANCE FOR YOUR HELP.
  
(You need to Login or Register to view media files and links) (Attachment deleted)
Back to top
 
IP Logged
 
BJE
Coaster Bike
**
Offline


Work Ride Tarheel Trailblazers

Posts: 222
Location: Belmont
Joined: 01/27/15
Re: Trail Work at Rocky Branch Park
Reply #24 - 12/12/17 at 5:05pm
Print Post  
Gaston Composite (Gaston county NICA team) will be getting some service hours in at Rocky Branch Park this Saturday (12/19) Grin .  Come on out and help show these young volunteers how to help maintain the great trails we ride. 

When: Saturday Dec. 19 from 10:00 to 2:00. 
Where: Meet at the trail head, but if you come late there will be signs or map showing where we are working.
What: We will be working on building up some berms in need of dirt and general trail maintenance. 

Bring gloves and water ( and remember to wear layers).  If you have a your own favorite shovel/trail tool please feel free to bring it otherwise tools will be provided. Extra wheel barrows always welcomed. 

Hope to see you out there.  THANK YOU IN ADVANCE FOR YOUR HELP.
  
(You need to Login or Register to view media files and links) (Attachment deleted)
Back to top
 
IP Logged
 
FMWilly
Coaster Bike
**
Offline


Work Ride Tarheel Trailblazers

Posts: 64
Location: Fort Mill, SC
Joined: 11/28/16
Re: Trail Work at Rocky Branch Park
Reply #25 - 12/15/17 at 7:46pm
Print Post  
Due you mean 12/16?
  
(You need to Login or Register to view media files and links) (Attachment deleted)
Back to top
 
IP Logged
 
BJE
Coaster Bike
**
Offline


Work Ride Tarheel Trailblazers

Posts: 222
Location: Belmont
Joined: 01/27/15
Re: Trail Work at Rocky Branch Park
Reply #26 - 12/18/17 at 4:58pm
Print Post  
Yes I did. Sorry. Embarrassed
  
(You need to Login or Register to view media files and links) (Attachment deleted)
Back to top
 
IP Logged
 
BJE
Coaster Bike
**
Offline


Work Ride Tarheel Trailblazers

Posts: 222
Location: Belmont
Joined: 01/27/15
Re: Trail Work at Rocky Branch Park
Reply #27 - 12/18/17 at 5:17pm
Print Post  
BIG SHOUT OUT TO GASTON COMPOSITE NICA TEAM! Grin

They came out and did some great work helping to rebuild some berms that were in need of a lot of dirt.  Big thank you to all the NICA racers and the adults who helped guide (and worked pretty hard too) them.  I can't wait to get out and try the berms out.

Kudos to the Gaston Composite Leaders for setting up the service time and allowing the kids to assist in maintaining the trails at RBP.  Cheesy 

Here are a few pictures of their completed work.
  
(You need to Login or Register to view media files and links) NICA_WORKDAY.JPG (Attachment deleted)
Back to top
 
IP Logged
 
BJE
Coaster Bike
**
Offline


Work Ride Tarheel Trailblazers

Posts: 222
Location: Belmont
Joined: 01/27/15
Re: Trail Work at Rocky Branch Park
Reply #28 - 02/01/18 at 5:42pm
Print Post  
Heading out on Saturday morning (2/3/18 between 9:00-1:00) to work on new Ravine Loop (advance loop off of SWC Extension).  Will meet at the top of the power climb (will leave map the entrance showing where we are working for those not familiar with trail). 

I have flagged and done some preliminary clearing, now need to finish clearing and start doing the finishing cut. If you want to help or provide some input in the trail before it is finalized come on by.  I will have tools (unless you like using your own), so you just need gloves and water.  Suggested Dress: In layers.

THANK YOU IN ADVANCE FOR YOUR HELP.   Smiley
  
(You need to Login or Register to view media files and links) (Attachment deleted)
Back to top
 
IP Logged
 
BJE
Coaster Bike
**
Offline


Work Ride Tarheel Trailblazers

Posts: 222
Location: Belmont
Joined: 01/27/15
Re: Trail Work at Rocky Branch Park
Reply #29 - 02/05/18 at 4:57pm
Print Post  
Big Thanks  Cheesy to Mike, Alberto and Hank for helping out Saturday. 
Heading back out again (weather permitting) this Saturday (and most likely Sunday) morning (2/10/18 and 2/11/18) between 9:00-2:00, to continue work on new Ravine Loop (advance loop off of SWC Extension).  Will meet at the top of the power climb (will leave map the entrance showing where we are working for those not familiar with trail). 

I have flagged and done some preliminary clearing, now need to finish clearing and start doing the finishing cut. If you want to help or provide some input in the trail before it is finalized come on by.  I will have tools (unless you like using your own), so you just need gloves and water.  Suggested Dress: In layers.

THANK YOU IN ADVANCE FOR YOUR HELP. Smiley
« Last Edit: 02/05/18 at 5:15pm by BJE »  
(You need to Login or Register to view media files and links) (Attachment deleted)
Back to top
 
IP Logged
 
BJE
Coaster Bike
**
Offline


Work Ride Tarheel Trailblazers

Posts: 222
Location: Belmont
Joined: 01/27/15
Re: Trail Work at Rocky Branch Park
Reply #30 - 02/09/18 at 5:06pm
Print Post  
DUE TO THE THREAT OF RAIN Cry POSTPONING ABOVE WORKDAY TO 2-17-18.

If it does not rain I will most likely be working on the trail.
  
(You need to Login or Register to view media files and links) (Attachment deleted)
Back to top
 
IP Logged
 
BJE
Coaster Bike
**
Offline


Work Ride Tarheel Trailblazers

Posts: 222
Location: Belmont
Joined: 01/27/15
Re: Trail Work at Rocky Branch Park
Reply #31 - 02/23/18 at 3:02pm
Print Post  
Thanks to those that came out last week to lend a hand. Cheesy  And thanks to those that came out last night to help provide some guidance in how we can make this loop a lot more exciting.  Grin
 
I plan to be out there this weekend (9 to 2) working on the new loop.  If you would like to help or see what is planned come on out.  Once again the new loop is at the top of the power climb in the ravine.
  
(You need to Login or Register to view media files and links) (Attachment deleted)
Back to top
 
IP Logged
 
BJE
Coaster Bike
**
Offline


Work Ride Tarheel Trailblazers

Posts: 222
Location: Belmont
Joined: 01/27/15
Re: Trail Work at Rocky Branch Park
Reply #32 - 03/27/18 at 4:31pm
Print Post  
Need some help moving some (heavy) material for two creek crossings.  The more people the easier it will be.  When: Saturday 3/31/18 at 9:00.  Where: Main Entrance  What to bring: Gloves and water along with a strong back.

THANK YOU IN ADVANCE FOR YOUR HELP. Smiley
  
(You need to Login or Register to view media files and links) (Attachment deleted)
Back to top
 
IP Logged
 
Doc00t
IB Room
In The Loop
Project Board
Offline


When in DOUBT, PEDAL it
OUT

Posts: 1785
Location: University
Joined: 05/09/12
Re: Trail Work at Rocky Branch Park
Reply #33 - 03/27/18 at 4:47pm
Print Post  
BJE wrote on 03/27/18 at 4:31pm:
Need some help moving some (heavy) material for two creek crossings.  The more people the easier it will be.  When: Saturday 3/31/18 at 9:00.  Where: Main Entrance  What to bring: Gloves and water along with a strong back.

THANK YOU IN ADVANCE FOR YOUR HELP.  Smiley

  
(You need to Login or Register to view media files and links) (Attachment deleted)

Scars are like Tattoos only with better Stories
Back to top
 
IP Logged
 
BJE
Coaster Bike
**
Offline


Work Ride Tarheel Trailblazers

Posts: 222
Location: Belmont
Joined: 01/27/15
Re: Trail Work at Rocky Branch Park
Reply #34 - 04/02/18 at 11:33am
Print Post  
Grin Big thanks to everyone who showed up to help! Grin  You made an impossible job easy.  Come back and ride the Branch soon so you can see the results of your hard work.
  
(You need to Login or Register to view media files and links) (Attachment deleted)
Back to top
 
IP Logged
 
BJE
Coaster Bike
**
Offline


Work Ride Tarheel Trailblazers

Posts: 222
Location: Belmont
Joined: 01/27/15
Re: Trail Work at Rocky Branch Park
Reply #35 - 04/13/18 at 5:51pm
Print Post  
Need to get the trail ready for the CYCL race the following weekend.

Got a bunch of dirt to spread out and pack in (at the entrance), also need to give the trail a good once over before the race (get rid of all the face slappers and grabbers).

When: 5/5 and 5/6
Where:  Rocky Branch Trail, Main entrance
Time: 5/5 8:00 to 2:00 5/6 10:00 to 2:00
What to bring:  Gloves, water, (loppers, shovel and wheel barrow if you can), otherwise tools will be provided.

Hope to see you out there so we make the trail shine for the race.

As always, THANK YOU IN ADVANCE FOR YOUR HELP.    Grin
  
(You need to Login or Register to view media files and links) (Attachment deleted)
Back to top
 
IP Logged
 
Doc00t
IB Room
In The Loop
Project Board
Offline


When in DOUBT, PEDAL it
OUT

Posts: 1785
Location: University
Joined: 05/09/12
Re: Trail Work at Rocky Branch Park
Reply #36 - 04/16/18 at 9:49pm
Print Post  
A new App for your phone for looking and signing up for workdays.  Its Called Golden Volunteer.

Used it to Create an event for Rocky Branch.  Get details, have emergency contact automatically applied, sign wavier, have hours tracked and logged.  Try it out and let me know what you think.

(You need to Login or Register to view media files and links)

  
(You need to Login or Register to view media files and links) (Attachment deleted)

Scars are like Tattoos only with better Stories
Back to top
 
IP Logged
 
BJE
Coaster Bike
**
Offline


Work Ride Tarheel Trailblazers

Posts: 222
Location: Belmont
Joined: 01/27/15
Re: Trail Work at Rocky Branch Park
Reply #37 - 05/03/18 at 4:25pm
Print Post  
Quick Reminder

Re: Trail Work at Rocky Branch Park

When: 5/5 and 5/6
Where:  Rocky Branch Trail, Main entrance
Time: 5/5 8:00 to 2:00 5/6 10:00 to 2:00
What to bring:  Gloves, water, (loppers, shovel and wheel barrow if you can), otherwise tools will be provided.

Hope to see you out there so we make the trail shine for the race.

As always, THANK YOU IN ADVANCE FOR YOUR HELP.
  
(You need to Login or Register to view media files and links) (Attachment deleted)
Back to top
 
IP Logged
 
BJE
Coaster Bike
**
Offline


Work Ride Tarheel Trailblazers

Posts: 222
Location: Belmont
Joined: 01/27/15
Re: Trail Work at Rocky Branch Park
Reply #38 - 05/09/18 at 4:16pm
Print Post  
Heading out tonight (5/9) and again tomorrow night after work (5:00 pm) to try and finish shaping the berms (piles of dirt right now) that I moved last weekend.  Would like to get them nice for the CYCL race this Sunday.  All the work to be done is at the entrance of Rocky Branch.  Flat shovels welcomed, otherwise we got the tools.
« Last Edit: 05/09/18 at 4:34pm by BJE »  
(You need to Login or Register to view media files and links) Moving_Dirt_5-5-18.JPG (Attachment deleted)
Back to top
 
IP Logged
 
BJE
Coaster Bike
**
Offline


Work Ride Tarheel Trailblazers

Posts: 222
Location: Belmont
Joined: 01/27/15
Re: Trail Work at Rocky Branch Park
Reply #39 - 06/26/18 at 4:55pm
Print Post  
In case you were wondering where all the dirt went, it allowed us to build some cool berms and tables (all shaped, packed and ready to ride).  See attached pictures.  

Now on to the next project (yes there is always something to do in the woods).

I will be out this Saturday (6/30/18 from 8:00 to 1:00) working on a new creek crossing and bridge.  If you would like to come out and help that is always great.  From the main entrance just follow the right-away to the creek crossing and you will find me working there.  Bring boots (we will be working in the creek) bug spray and water (to drink).

Hope to see you there. Smiley
« Last Edit: 06/26/18 at 5:02pm by BJE »  
(You need to Login or Register to view media files and links) berms_and_tables_001.pdf (Attachment deleted)