Page Index Toggle Pages: 1 Print
Normal Topic Rocky Branch Trail Work (Read 690 times)
BJE
Coaster Bike
**
Offline


Work Ride Tarheel Trailblazers

Posts: 222
Location: Belmont
Joined: 01/27/15
Rocky Branch Trail Work
07/11/18 at 1:52pm
Print Post  
Got one bridge done and now need to finish the next one.

I will be out this Saturday (7/14/18 from 8:00 to 12:00) working on the next bridge and hopefully finishing up the new extension trail.  Your help is is always welcomed. From the main entrance just follow the right-away to the second creek crossing and you will find me working.  Portable power tools always welcomed but not necessary. Tools will be provided. Bring water and a snack.  Bug spray and long pants (strongly) recommended.

Hope to see you there.
  
(You need to Login or Register to view media files and links) 20180708_184146.jpg (Attachment deleted)
Back to top
 
IP Logged
 
BJE
Coaster Bike
**
Offline


Work Ride Tarheel Trailblazers

Posts: 222
Location: Belmont
Joined: 01/27/15
Re: Rocky Branch Trail Work
Reply #1 - 10/12/18 at 3:52am
Print Post  
Heading out to RBP after work (4:30) on friday to clean up a bunch of downed trees and debris, so we have clear trails to ride on Saturday for SMC's demo day. Hope you can lend a hand.   

Feel free to go out early and start picking up the smaller stuff on the trail, but please no unsupervised chain sawing.
  
(You need to Login or Register to view media files and links) (Attachment deleted)
Back to top
 
IP Logged
 
BJE
Coaster Bike
**
Offline


Work Ride Tarheel Trailblazers

Posts: 222
Location: Belmont
Joined: 01/27/15
Re: Rocky Branch Trail Work
Reply #2 - 10/12/18 at 3:55am
Print Post  
Friday 10/12/18 5:00 pm til 7:00.
  
(You need to Login or Register to view media files and links) (Attachment deleted)
Back to top
 
IP Logged
 
Page Index Toggle Pages: 1
Print