Page Index Toggle Pages: 1 Print
Normal Topic Beatty Improvements (Read 363 times)
Robert C.
Big Ring
*****
Offline


Leaves are the ultimate
trail maintenance tool

Posts: 1806
Location: Available upon request
Joined: 11/22/04
Beatty Improvements
08/01/18 at 3:03am
Print Post  
Rode FJB yesterday for probably the first time in a year.  All the cut thrus and go arounds have improved the trail flow dramatically.

Oh and all the wooden structure work and pump track aren't half bad either.   Wink
« Last Edit: 08/01/18 at 3:04am by Robert C. »  
(You need to Login or Register to view media files and links) (Attachment deleted)
Back to top
 
IP Logged
 
Page Index Toggle Pages: 1
Print