Page Index Toggle Pages: 1 Print
Hot Topic (More than 10 Replies) Beatty Bridge Build 1/5 (Read 2632 times)
SirNotAppearing
IB Room
In The Loop
Offline


Work Ride Tarheel Trailblazers

Posts: 1216
Joined: 03/08/10
Beatty Bridge Build 1/5
01/03/19 at 2:45pm
Print Post  
1/5 9am
Pond parking lot (left at the stop sign, all the way back)

We are replacing the 20 foot bridge with hand rails below the dam, with a 24' bridge. This will be a pretty big undertaking, so I'll take as many hands as I can get! Bring gloves and water. We'll order pizza, and I'll make sure there's beer when we're done
  
(You need to Login or Register to view media files and links) (Attachment deleted)
Back to top
IP Logged
 
The Cycle Path
IB Room
In The Loop
Project Board
Offline


Treasurer '11 to '18.
Trail Chair '12-'18,
'20-'21

Posts: 11858
Location: Lake Norman
Joined: 08/04/03
Re: Beatty Bridge Build 1/5
Reply #1 - 01/03/19 at 4:46pm
Print Post  
What do we need in the way of tools?  I can bring the club generator and my corded 1/2" drill if need be. Smiley
  
(You need to Login or Register to view media files and links) (Attachment deleted)

We carry the finest from Specialized, Yeti, Transition, and Kona.
Back to top
IP Logged
 
SirNotAppearing
IB Room
In The Loop
Offline


Work Ride Tarheel Trailblazers

Posts: 1216
Joined: 03/08/10
Re: Beatty Bridge Build 1/5
Reply #2 - 01/03/19 at 6:22pm
Print Post  
Yes, if you can bring the generator and drill, that would be great! We were using a borrowed generator last time.
  
(You need to Login or Register to view media files and links) (Attachment deleted)
Back to top
IP Logged
 
BudLeach
Small Cog
***
Offline



Posts: 394
Location: Gastonia
Joined: 09/09/14
Re: Beatty Bridge Build 1/5
Reply #3 - 01/04/19 at 2:19pm
Print Post  
I'll be there. I can bring my 7 1/4" corded Skil Saw if there will be a decent generator (at least 2000W). 

I'll bring a couple sawhorses and my battery power tools as well.
  
(You need to Login or Register to view media files and links) (Attachment deleted)
Back to top
 
IP Logged
 
Robert C.
Big Ring
*****
Offline


Leaves are the ultimate
trail maintenance tool

Posts: 1806
Location: Available upon request
Joined: 11/22/04
Re: Beatty Bridge Build 1/5
Reply #4 - 01/04/19 at 2:31pm
Print Post  
Push this out a week and I'll join.  Might be a little less muddy. Angry
  
(You need to Login or Register to view media files and links) (Attachment deleted)
Back to top
 
IP Logged
 
The Cycle Path
IB Room
In The Loop
Project Board
Offline


Treasurer '11 to '18.
Trail Chair '12-'18,
'20-'21

Posts: 11858
Location: Lake Norman
Joined: 08/04/03
Re: Beatty Bridge Build 1/5
Reply #5 - 01/04/19 at 2:52pm
Print Post  
BudLeach wrote on 01/04/19 at 2:19pm:
I'll be there. I can bring my 7 1/4" corded Skil Saw if there will be a decent generator (at least 2000W). 

I'll bring a couple sawhorses and my battery power tools as well.

I'm bringing a Honda 2200 watt generator.
  
(You need to Login or Register to view media files and links) (Attachment deleted)

We carry the finest from Specialized, Yeti, Transition, and Kona.
Back to top
IP Logged
 
SirNotAppearing
IB Room
In The Loop
Offline


Work Ride Tarheel Trailblazers

Posts: 1216
Joined: 03/08/10
Re: Beatty Bridge Build 1/5
Reply #6 - 01/04/19 at 3:04pm
Print Post  
Robert C. wrote on 01/04/19 at 2:31pm:
Push this out a week and I'll join.  Might be a little less muddy. Angry


It will never be less muddy. This is our life now.
  
(You need to Login or Register to view media files and links) (Attachment deleted)
Back to top
IP Logged
 
SurlyDave
Small Cog
***
Offline


Work Ride Tarheel Trailblazers

Posts: 326
Location: Indian Trail
Joined: 09/03/12
Re: Beatty Bridge Build 1/5
Reply #7 - 01/05/19 at 12:09am
Print Post  
IN.  You had me at pizza and beer.
  
(You need to Login or Register to view media files and links) (Attachment deleted)
Back to top
 
IP Logged
 
Robert C.
Big Ring
*****
Offline


Leaves are the ultimate
trail maintenance tool

Posts: 1806
Location: Available upon request
Joined: 11/22/04
Re: Beatty Bridge Build 1/5
Reply #8 - 01/05/19 at 12:58am
Print Post  
SirNotAppearing wrote on 01/04/19 at 3:04pm:


It will never be less muddy. This is our life now.


True dat, unfortunately.   Can't even get it cold enough to freeze the trails anymore.
  
(You need to Login or Register to view media files and links) (Attachment deleted)
Back to top
 
IP Logged
 
pokyman
Newbie
*
Offline


Work Ride Tarheel Trailblazers

Posts: 25
Joined: 08/13/16
Re: Beatty Bridge Build 1/5
Reply #9 - 01/05/19 at 9:28pm
Print Post  
SirNotAppearing wrote on 01/03/19 at 2:45pm:

We are replacing the 20 foot bridge with hand rails below the dam, with a 24' bridge. This will be a pretty big undertaking, so I'll take as many hands as I can get! Bring gloves and water. We'll order pizza, and I'll make sure there's beer when we're done   


(You need to Login or Register to view media files and links)

(You need to Login or Register to view media files and links)

(You need to Login or Register to view media files and links)

(You need to Login or Register to view media files and links)

(You need to Login or Register to view media files and links)

(You need to Login or Register to view media files and links)

Great turnout today!
Steve
  
(You need to Login or Register to view media files and links) (Attachment deleted)
Back to top
 
IP Logged
 
Oskie
In The Loop
*****
Offline



Posts: 243
Joined: 07/25/06
Re: Beatty Bridge Build 1/5
Reply #10 - 01/06/19 at 8:41pm
Print Post  
If anyone is missing a speed square from yesterday, I have one that isn't mine.
  
(You need to Login or Register to view media files and links) (Attachment deleted)
Back to top
 
IP Logged
 
dave mac
Newbie
*
Offline


Work Ride Tarheel Trailblazers

Posts: 46
Location: nc
Joined: 02/10/10
Re: Beatty Bridge Build 1/5
Reply #11 - 01/06/19 at 11:38pm
Print Post  
many thanks to you guys
  
(You need to Login or Register to view media files and links) (Attachment deleted)
Back to top
 
IP Logged
 
Solar
Little Ring
****
Offline


I can ride my bike with
no handle bars

Posts: 693
Location: Matthews
Joined: 10/26/11
Re: Beatty Bridge Build 1/5
Reply #12 - 01/07/19 at 3:25pm
Print Post  
I'm happy to see you guys had a good turnout.  I was hoping to join you all but couldn't get away from other obligations.   

I noticed a board with Tarheel put on it, was that router out or stained?  How/where was that placed.  Assuming the whole club name is on there, that's a great idea.  For those that don't pay attention to the signs on the trees, most people look down when they walk over a bridge.  It would be a great way to give the club some recognition for the work done on the trails.   

Thanks to all of you that showed up, I appreciate you giving your time and energy.   

  
(You need to Login or Register to view media files and links) (Attachment deleted)

I want to grow my own food, but I can't find any bacon seeds.
Back to top
WWW  
IP Logged
 
DAH
Newbie
*
Offline


Work Ride Tarheel Trailblazers

Posts: 32
Joined: 05/28/15
Re: Beatty Bridge Build 1/5
Reply #13 - 01/07/19 at 3:55pm
Print Post  
It was awesome turn out. Thanks to all that help. Any more pics out there.
  
(You need to Login or Register to view media files and links) (Attachment deleted)
Back to top
 
IP Logged
 
SirNotAppearing
IB Room
In The Loop
Offline


Work Ride Tarheel Trailblazers

Posts: 1216
Joined: 03/08/10
Re: Beatty Bridge Build 1/5
Reply #14 - 01/07/19 at 6:31pm
Print Post  
Craig Watts did the routing, it looks fantastic.
(You need to Login or Register to view media files and links)
(You need to Login or Register to view media files and links)
  
(You need to Login or Register to view media files and links) (Attachment deleted)
Back to top
IP Logged
 
INTENSEcretAgent
Small Cog
***
Offline



Posts: 437
Location: Matthews, NC / Beatty
Joined: 07/09/08
Re: Beatty Bridge Build 1/5
Reply #15 - 01/07/19 at 8:28pm
Print Post  
@SirNotAppearing whats being done with the old bridge now sitting on the side?

Is it being disposed of or re purposed?  If you are not re purposing it, and have to dispose, I live right here and can use / re purpose the wood?

Let me know.

PS.  Looks really great guys.  Thanks for all the hard work!
« Last Edit: 01/07/19 at 8:29pm by INTENSEcretAgent »  
(You need to Login or Register to view media files and links) (Attachment deleted)
Back to top
 
IP Logged
 
SirNotAppearing
IB Room
In The Loop
Offline


Work Ride Tarheel Trailblazers

Posts: 1216
Joined: 03/08/10
Re: Beatty Bridge Build 1/5
Reply #16 - 01/07/19 at 8:33pm
Print Post  
I think we're going to use it for the mud spot right beside where it is. We just ran out of time to get it set.
  
(You need to Login or Register to view media files and links) (Attachment deleted)
Back to top
IP Logged
 
INTENSEcretAgent
Small Cog
***
Offline



Posts: 437
Location: Matthews, NC / Beatty
Joined: 07/09/08
Re: Beatty Bridge Build 1/5
Reply #17 - 01/07/19 at 9:24pm
Print Post  
That's a good call.  It has always been loose there. (even after light rains/water)
  
(You need to Login or Register to view media files and links) (Attachment deleted)
Back to top
 
IP Logged
 
Solar
Little Ring
****
Offline


I can ride my bike with
no handle bars

Posts: 693
Location: Matthews
Joined: 10/26/11
Re: Beatty Bridge Build 1/5
Reply #18 - 01/08/19 at 7:27pm
Print Post  
SirNotAppearing wrote on 01/07/19 at 6:31pm:
Craig Watts did the routing, it looks fantastic.



That looks great!  Nice work Craig.

  
(You need to Login or Register to view media files and links) (Attachment deleted)

I want to grow my own food, but I can't find any bacon seeds.
Back to top
WWW  
IP Logged
 
MTB4U
Coaster Bike
**
Offline


AKA: MTBSurfer

Posts: 169
Location: Matthews
Joined: 02/24/18
Re: Beatty Bridge Build 1/5
Reply #19 - 01/09/19 at 1:25pm
Print Post  
  Thank you THTB'rs for all you do.  If you work there again soon, I'll try to show up and help. 
« Last Edit: 01/09/19 at 4:41pm by MTB4U »  
(You need to Login or Register to view media files and links) (Attachment deleted)
Back to top
 
IP Logged
 
Page Index Toggle Pages: 1
Print