Page Index Toggle Pages: 1 Print
Normal Topic BYT conditions... (Read 292 times)
slayemf
Big Ring
*****
Offline


Work Ride Tarheel Trailblazers

Posts: 1133
Location: charlotte
Joined: 02/22/12
BYT conditions...
02/26/16 at 10:05pm
Print Post  
I walked through most of the Farmbrook side of BYT this afternoon. I have to say that there are many dead trees leaning on other trees and ready to go . Gumballs are about on most of the trail and there is standing water in certain areas , after the poo tracks once you come around that berm and go up to the top, the water is all over and it is deep. The top going into the trail is the same. I got most of the limbs down off the trail and any other twigs but some of the branches need to be cut. There is one tree down right before you get to the fire road by the Waste Treatment Plant that is no taller than me,,not saying much, but it will hit you right in the face if you try and ride the trail. I say this without makeing any of you mad but the trail needs to be closed for at least another 2 to 3 days so we can get in there and cut the trees that are dead and leaning and also to do some drainige work on where the water is sitting on the trail. I am makeing this call due to the safety  of you all. I ride this trail , I work on this trail and I love this trail and I don't want to see it shut down so please give those days and try to come out to help Worker-Rider out tomorrow . I am going to be there after work if I am not layering a ramp. Guys it is so important that you please for your saftey  try not to ride the trail..We appreciate it a lot. It needs a lot of love. As for the jump line it is fine and the new Jump line looks and seems to be comeing along great, thanks to Paul Cunningham and Josh Krynock and a few others..Guys let's be safe not stupid..Enjoy your weekend and more trail work days will be posted at the BYT and anywhere else, just check the listings..RAMFB...
  
(You need to Login or Register to view media files and links) (Attachment deleted)
Back to top
 
IP Logged
 
worker-rider
In The Loop
*****
Offline



Posts: 962
Location: concord nc
Joined: 12/18/04
Re: BYT conditions...
Reply #1 - 02/27/16 at 12:11am
Print Post  
Thanks Rocky a few other guys are going out to clear the trail while we work on the bridge. Lots of sticks down where i walked this morning. Go to work days on forum.
  
(You need to Login or Register to view media files and links) (Attachment deleted)
Back to top
 
IP Logged
 
Page Index Toggle Pages: 1
Print