Cedar Valley
09/11/20 at 4:02pm
Print Post  
Has Cedar closed down for the 4 weeks discussed on the Sept virtual meeting for the new jump line build?
  
Back to top
 
IP Logged
 
TrillWill
IB Room
In The Loop
Project Board
Offline


THTB Board member 16'-23'
LKN TC

Posts: 1027
Location: Cornelius
Joined: 06/14/11
Re: Cedar Valley
Reply #1 - 09/11/20 at 9:36pm
Print Post  
Yep, the closure right now is part of the construction that will lead to the new jump line.

I don't know if it's going to be exactly one 4 week closure as there may be a couple different multi week closures to facilitate the realignment of the sweet leaf section of trail, and then the construction of the new jump line.

Evan and crew are re aligning the sweet leaf section right now which is why it's closed.  Unfortunately quite a few people rode through the chains yesterdsay and rode on the fresh section and there are tire ruts in it... Cry

  

Ride boards, ride bikes, ride life #shredeverything
Back to top
 
IP Logged
 
Fud
Newbie
*
Offline


Work Ride Tarheel Trailblazers

Posts: 18
Location: Charlotte
Joined: 07/27/20
Re: Cedar Valley
Reply #2 - 09/11/20 at 10:27pm
Print Post  
Hope the trail cams caught the rogues
  
Back to top
 
IP Logged
 
Suprider
Newbie
*
Offline


Work Ride Tarheel Trailblazers

Posts: 6
Location: Davidson
Joined: 12/19/19
Re: Cedar Valley
Reply #3 - 09/22/20 at 9:43am
Print Post  
I saw Fisher was closed as of last night. Does anyone know if that is due to Stream Mitigation work? From the article it sounded like the trails were going to remain open during the work.
  
Back to top
 
IP Logged
 
The Cycle Path
IB Room
In The Loop
Project Board
Offline


Treasurer '11 to '18.
Trail Chair '12-'18,
'20-'21

Posts: 11858
Location: Lake Norman
Joined: 08/04/03
Re: Cedar Valley
Reply #4 - 09/22/20 at 10:49am
Print Post  
Suprider wrote on 09/22/20 at 9:43am:
I saw Fisher was closed as of last night. Does anyone know if that is due to Stream Mitigation work? From the article it sounded like the trails were going to remain open during the work.


It is temporarily closed while fencing and signage is installed and updated. Thanks for the cooperation!
  